| Project Title | Duration | Client |
|---|---|---|
| Completion Of Godown 3 Works at The Rice Miller Hotel, Weld Quay, Penang (Design & Built) | 8 Months | Asian Global Business Sdn Bhd |
| Proposed New Extension At Gold Coin Feedmills, Mak Mandin, Butterworth (Design & Built) | 1 Month | Goldcoin Feedmills (M) Sdn Bhd |
| Proposed Extended Aeration Tank 24m X 6m X 6m Height at Plant 7, Kamutning, Perak (Design & Built) | 1 Month | Latexx Manufacturing Sdn Bhd / Semperit Asia Group |
| Proposed Soya Warehouse D At Gold Coin Feedmills, Mak Mandin, Butterworth ( Design & Built) | 1 Month | Goldcoin Feedmills (M) Sdn Bhd |
| Design Audit Check For 3 Blocks Of Low Cost Rumah Rakyat 1m, Mergong, Kedah | 5 Months | Binaan Sentosa Sdn Bhd |
| Cadangan Membina Press Machine & Membina Gudang Baru Di Kilang Continental Tyre, Alor Setar (Epcm) (Design & Built) | 10 Months | Continental Tyres As Sdn Bhd |
| Proposed Clarifer Tank 10m Dia X 6m Height At Plant 7, Kamutning, Perak ( Design & Built) | 4 Months | Latexx Manufacturing Sdn Bhd / Semperit Asia Group |
| Proposed Strengthening Of Telecommunication Towers Using CFRP In Kingdom Of Cambodia ( Epcm/Design & Built) | 6 Months | Edotco (Cambodia) Pte Ltd |
| Proposed Repair Of Old Jetty At MSM Perai (Design & Built) | 3 Months | Msm Perai Berhad |
| Cadangan Kilang 2 Tingkat & 1 Tingkat Pejabat Mezanin Diatas Lot3480, Mk 12, Dbd, Pulau Pinang (Epcm/Design & Built) | 8 Months | Cortex Robotics Sdn Bhd |
| Proposed Refurbishment of Wastewater Plant At Acidchem 2, Perai (Design & Built) | 3 Months | Ioi Acidchem Sdn Bhd |
| Proposed Nfpa Water Tank ( 930m3 X 2 Units ) At Site B, Ansell , Kulim, Kedah ( Epcm/Design & Built) | 6 Months | Ansell Speciality & Gloves Sdn Bhd |
| Project Title | Duration | Client |
|---|---|---|
| Tell-Tale & Settlement Marker Monitoring Work at Hutton Terrace, Jalan Hutton, 10050 Georgetown, Penang. | 6 Months | Jacsui Sdn Bhd |
| Dilapidation & Mitigation Report For Permohonan Kebenaran Merancang Untuk Meroboh Sebahagian Satu Unit Rumah Sesebuah (Bangunan Warisan Kategori 2) 2 Tingkat Sediada Bernombor 21b, Jalan Ayer Itam Dan Cadangan Untuk Tukar Guna Bangunan Sediada Kepada Bangunan Perniagaan Diatas Sebahagian Lot 1669 Seksyen 2 Bandar Ayer Itam, Daerah Timur Laut, Pulau Pinang. | Sri Awona Sdn. Bhd | |
| Wesley Methodist Church Penang, 136 Jalan Burma, 10050 Georgetown, Penang Tell-Tale Crack Monitoring Works | Wesley Methodist Church Penang | |
| Dilapidation & Mitigation Report for Cadangan Membaikpulih Dan Pindaan Kepada 3 Unit Bangunan 2 Tingkat Sedia Ada, No. 10, 12 & 14, Lebuh Campbell, Di Atas Lot 1551, Seksyen 18, Bandar George Town, D.T.L, Pulau Pinang. | Richfont Sdn. Bhd. | |
| Dilapidation & Mitigation Report For Cadangan Bagi Membaikpulih Bangunan Rumah Kedai 2 – Tingkat Sedia Ada No. 419, Lebuh Chulia Dia Atas Lot 10064 Seksyen 18, Bandar George Town, Pulau Pinang Untuk : Tetuan Starhill Dynasty Sdn. Bhd. | Starhill Dynasty Sdn Bhd | |
| Visual Inspection and NDT Test Report for Structural Conditional Assessment Report on Existing Silo in Gold Coin Feedmilles (M) Sdn Bhd | Gold Coin Feedmilles (M) Sdn Bhd | |
| Dilapidation Survey (Condition of Survey) No 7, Jalan Selayang 1, Taman Selayang, Sg Puyu, 13020 Butterworth, Penang | ||
| Building Assessment Report Lumut Water Front Villa | Lumut Water Front Villa | |
| Pre-construction Condition Survey Dilapidation Report for Pertubuhan Perayaan Yee Lan | Pertubuhan Perayaan Yee Lan | |
| Existing Slab Checking and Investigation Of Floor Strength For Factory At Plot No 82a, Lintang Bayan Lepas, Taman Perindustrian Bayan Lepas, Mukim 12, Phase Iv, 11900 Bayan Lepas, Penang | Ambu Sdn Bhd |
| Project Title | Duration | Client |
|---|---|---|
| Proposed Conservation Works No. 1, Muda Lane, Pulau Pinang | 12 Months | Georgetown World Heritage Incorporated Sdn Bhd |
| Kerja Baik Pulih Kubu Kebal (Pillbox) BD01 Di Atas Lot 644, Mukim 9, Jalan Gertak Sanggul, Kampung Nelayan, 11921, Teluk Kumbar, Dearah Barat Daya, Pulau Pinang | 2 Weeks | Georgetown World Heritage Incorporated Sdn Bhd |
| Kerja Baik Pulih Kubu Kebal (Pillbox) BD02 Di Atas Lot 1225 Dan 588, Mukim 9, Jalan Cikgu Abu, Kampung Nelayan, 11000, Teluk Kumbar, Daerah Barat Daya, Pulau Pinang | 3 Months | Georgetown World Heritage Incorporated Sdn Bhd |
| Proposed Conservation Works To No. 7, Weld Quay, 10300 P. Pinang. | 12 Months | Pph Plaza Sdn Bhd |
| Eng Chuan Tong Tan Kongsi_Repair Works | 6 Months | Eng Chuan Tan Kongsi |
| Repair Work of The Repair Works Of Trustees Of Boon San Tong Khoo Kongsi (Penang) Registered, No 117-A Lebuh Victoria, 10300, George Town, Pulau Pinang | 12 Months | Boon San Tong Khoo Kongsi (Penang) Georgetown World Heritage Incorporated Sdn Bhd |
| Repair Work of Lum Yeong Tong Yap Temple, No 71, Lebuh Armenian, Di Atas Lot 438, Seksyen 21, 10200, George Town, Pulau Pinang | 12 Months | Lum Yeong Tong Yap Temple Georgetown World Heritage Incorporated Sdn Bhd |
| Repair Work of Tan Si Eng Chuan Tong, No, 28, Halaman Seh Tan, Di Atas Lot 557, Seksyen 22, 10300, George Town, Pulau Pinang | 12 Months | Tan Si Eng Chuan Tong Kongsi Georgetown World Heritage Incorporated Sdn Bhd |
| Repair Work of Hock Teik Cheng Sin Temple, No. 57, Lebuh Armenian, 10200, George Town, Pulau Pinang | 12 Months | Hock Teik Cheng Sin Temple Georgetown World Heritage Incorporated Sdn Bhd |
| Repair Work of Kar Yin Fee Kon, No 22 And 24, Lebuh King, Di Atas Lot 561, Seksyen 20, 10200, Bandar George Town, Pulau Pinang | 12 Months | Kar Yin Fee Kon Georgetown World Heritage Incorporated Sdn Bhd |
| Repair Work of St. George’s Church, No 1, Lebuh Farquhar, Di Atas Lot 422, Seksyen 19, 10200, Bandar George Town, Pulau Pinang | 12 Months | St. George’s Church Georgetown World Heritage Incorporated Sdn Bhd |
| Repair Work of Masjid Kapitan Keling, No 14, Lebuh Buckingham, Di Atas Lot 1221, Seksyen 18, 10200, George Town, Pulau Pinang | 12 Months | Masjid Kapitan Keling Georgetown World Heritage Incorporated Sdn Bhd |
| Repair Work of Penang Goldsmiths Association ( Ta Kam Hong ), No 41, Lebuh Muntri, Di Atas Lot 647, Seksyen 19, 10200, Bandar George Town, Pulau Pinang | 12 Months | Penang Goldsmiths Association (Ta Kam Hong) Georgetown World Heritage Incorporated Sdn Bhd |
| Repair Work of Balai Bomba Dan Penyelamat Lebuh Pantai, Di Atas Lot 139, Seksyen 23, 10300, Bandar George Town, Pulau Pinang | 12 Months | Balai Bomba Dan Penyelamat Georgetown World Heritage Incorporated Sdn Bhd |
| Proposed Restoration Works for The Existing Main Pavillion, East Cupola and West Cupola At Loke Mansion No. 147, Kelawai Lane, 10250, Georgetown, Penang. | 9 Weeks | Loke Wan Yat Realty Sdn Bhd |
| Cadangan Pindahan Dan Tambahan Kepada 1 Unit Rumah Teres Sedia Ada 2 Tingkat Di No.54, Lorong Prangin Di Atas Lot 420, Seksyen 22, Bandar, George Town, Daerah Timur Laut, Pulau Pinang. | 7 Months | Bhl Realty Sdn. Bhd. |
| Proposed Comprehensive Roof Repair Works at Loke Mansion No.147, Kelawai Lane, 10250 Georgetown, Penang. | 24 Weeks | Loke Wan Yat Realty Sdn. Bhd. |
| Project Title | Duration | Client |
|---|---|---|
| Package O Plant 7 At Latexx Factory, Kamunting, Perak. | 8 Months | Asian Global Business Sdn Bhd |
| Cadangan Tambahan Kilang Satu Tingkat Kepada Kilang Sediada Diatas Lot 1340, Lorong Perusahaan 5, Bandar Kulim, Kedah. | 1 Month | Latexx Manufacturing Sdn Bhd / Semperit Asia Group |
| Cadangan Pindaan Kepada Pondok Pengawal Dan Pintu Pagar Sedia Ada Serta Tambahan Kepada 1 Unit Struktur Bumbung Besi Di Atas Gelanggang Bola Keranjang Sediada Untuk SMKJ Sacred Heart, Di Atas Lot 257, 768, 770 & Sebahagian Lot 254 Jalan Bukit Penara, Mukim 6, Dbd, Pulau Pinang Untuk Tetuan Sacred Heart School Governor’s Board | 1 Month | Sacred Heart School Governor’s Board |
| Proposed New Extension At Gold Coin Feedmills, Mak Mandin, Butterworth. | 3 Months | Msm Perai Berhad |
| Waterproofing Works at Skim Sungai Semnyih – SS 1309. | 5 Months | Syabas, Selangor |
| Repair & Refurbishment of Talu R.C. Reservoir at Subang Bestari, Petaling Jaya. | 6 Months | Syabas, Selangor |
| Proposed Repair Works to Beam and Slab at Horizon Tower, Tg Bungah Park, Pulau Pinang. | 7 Weeks | Horizon Towers Management Corporation |
| Proposed Waterproofing Works at Gp Factory, Lumut, Perak. | 2 Months | Green Prospects Sdn Bhd |
| Proposed Raising of Slab at Warehouse B, Mak Mandin, Butterworth. | 2 Weeks | Goldcoin Feedmills (M) Sdn Bhd |
| Renovation Extension of Canteen and Kitchen Work | 3 Weeks | Zero Mass Water Holding Malaysia Sdn Bhd |
| Refurbish Office, Surau, Carpet Deep Clean & Work Station Powerpoint | 2 Weeks | Zero Mass Water Holding Malaysia Sdn Bhd |
| Inokom_Ivp 2.5 Renovation Works | 3 Weeks | Inokom Corporation Sdn Bhd |
| Flooring Works at Basketball Court | 3 Months | Sacred Heart School Governor’s Board |
| Cadangan Pindaan Kepada Bangunan Sedia Ada No. 55 Menara Notham, Jalan Sultan Ahmad Shah Bagi Ruang Hotel Yang Merangkumi: I. Paras 1a: Pindaan Dalaman, Tangga Baharu Dan Tangki Air & ‘Chiller Exhaust’ Baharu & Bumbung Kanopi Baharu Ii. Paras 5: Bumbung Baharu Dan Tempat Letak Kereta Sedia Ada Di Paras 4 Di Atas Lot 1242, Sek, Georgetown, D.T.L, Pulau Pinang. | 5 Months | Hng Hotels Sdn Bhd |
| Completion Of Structural Repair Works at No. 9 Weld Quay, Penang. | 6 Months | Asian Global Business Sdn Bhd |
| Structural Repair & Waterproofing Works for Godown At Weld Quay, P. Pinang. | 1 Month | Perunding MWR Sdn Bhd |
| Completion Of Internal Road & Drainage Works At The Rice Miller Hotel, Weld Quay, Penang. | 2 Months | Perunding MWR Sdn Bhd |
| Cadanga Kerja-Kerja Substruktur & Cerucuk Bagi Apartment 35 Tingkat Di Daerah Manjung, Sitiawan , Perak (Design & Built). | 40 Weeks | King Ong Development Sdn Bhd |
| Proposed Repair of Rc Structure at Palmco Bulking Installation (Pbi) Phase 1. | 3 Months | Palmco Bulking Installation Sdn Bhd |
| Proposed Repair of Rc Structure at Palmco Bulking Installation (Pbi) Phase 2. | 3 Months | Palmco Bulking Installation Sdn Bhd |
| Completion Of External Sewer & Water Reticulation Works at The Rice Miller Hotel, Weld Quay, Penang. | 4 Months | Perunding MWR Sdn Bhd |
| Hdpe Liner Works at Wet Pond at Bmhill Park, Alma, Bukit Mertajam, Penang. | 3 Months | Perunding Kelana Sdn Bhd |
| Cadangan Kerja-Kerja Infrastruktur Jalan & Parit Di Kelab Lumba Kuda Pulau Pinang. | 4 Months | Penang Turf Club |
| Cadangan Rumah Pam Air Di Kelab Lumba Kuda Pulau Pinang, Jalan Batu Gantong, Pulau Pinang. | 24 Weeks | Penang Turf Club |
| Completion Of Godown 2 Works at The Rice Miller Hotel, Weld Quay, Penang. | 4 Months | Asian Global Business Sdn Bhd |
| Completion Of Godown 1 Works at The Rice Miller Hotel, Weld Quay, Penang. | 4 Months | Asian Global Business Sdn Bhd |
| Cadangan Tambahan Kilang Satu Tingkat Kepada Kilang Sediada Diatas Lot 1340, Lorong Perusahaan 5, Bandar Kulim, Kedah. | 24 Weeks | Sinliplas Holdings Berhad |
| Project Title | Duration | Client |
|---|---|---|
| 1 Unit Kilang Berkembar 1 Tingkat Berserta Pantri Di Tingkat Mezzanine Dan Pejabat Dan Setor Di Tingkat 1, 1 Unit Kebuk Sampah Dan 1 Unit Pondok Pengawal (Lot 19774), 1 Unit Kilang Berkembar 1 Tingkat, 1 Unit Kebuk Sampah Dan 1 Unit Pondok Pengawal (Lot 19775), Di Atas Lot 19774 Dan 19775, Jalan Kpk 4/4, Kawasan Perindustrian Kundang, Kundang Jaya, Bandar Kundang, Mukim Rawang, Daerah Gombak, Majlis Perbandaran Selayang, Selangor Darul Ehsan. | 9+2 Months | Can Jaya Products Packaging Sdn Bhd |
Cadangan Membina :-- 1 Unit Kilang Sesebuah 1 Tingkat Berserta Gudang 1 Tingkat, Pejabat Di Tingkat 1, Pantri & Gudang Di Tingkat 2 Dan Pejabat Di Tingkat 3 (4 Tingkat),-- 1 Unit Kebuk Sampah Dan -- 1 Unit Pondok Pengawal Di Atas Pt 4604, Jalan Kpk 4/4, Kawasan Perindustrian Kundang, Kundang Jaya, Bandar Kundang, Mukim Rawang, Daerah Gombak, Majlis Perbandaran Selayang, Selangor Darul Ehsan. | 9+2 Months | Can Jaya Products Packaging Sdn Bhd |
| Cadangan Membina Sebuah Dewan 3 Tingkat Sekolah Menengah Kebangsaan Jalan Damai Diatas Lot 1084, Mukim 15, Jalan Damai, Bukit Mertajam, Seberang Perai Tengah. | 12 Months | Kementerian Pendidikan Malaysia |
| Piling &Substructure Works For Cadangan Mendirikan Sebuah Rumah Pengurusan Mayat Di Atas Pt 4678 (Plot Lama: Plot A, Bersempadanan Lot 3044), Mukim 1, Daerah Seberang Perai Tengah, Pulau Pinang. | 6 Months | Pertubuhan Perayaan Yee Lan |
| Cadangan Untuk Membina 4 Buah Gelanggang Bola Keranjang Terbuka Di Atas Sebahagian Lot 3402 (Lot Lama 2756), Seksyen 6, Bandar George Town, D.T.L., Jalan Lim Lean Teng, Pulau Pinang. | 3 Months | Penang Han Chiang Associated Chinese Schools Association |
| Proposed Warehouse Cr8 & Other Works At Lot 1222, Kawasan Perindustrian Kulim, Kedah. | 23 Weeks | Ansell Speciality & Gloves Sdn Bhd |
| Cadangan Membina 2 Unit Banglo Di Temoyong, Jalan Bukit Malut, Langkawi, Kedah. | 10 Months | Langkawi Real Estate Sdn Bhd |